{"name":"sysgenpro Blog","description":"","url":"https:\/\/www.sysgenpro.com\/blog","home":"https:\/\/www.sysgenpro.com\/blog","gmt_offset":"5.5","timezone_string":"","namespaces":["ithemes-security\/rpc","ithemes-security\/v1","contact-form-7\/v1","litespeed\/v1","yoast\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/www.sysgenpro.com\/blog\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/batch\/v1"}]}},"\/ithemes-security\/rpc":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ithemes-security\/rpc","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc"}]}},"\/ithemes-security\/rpc\/ban-users\/add-many":{"namespace":"ithemes-security\/rpc","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"bans":{"title":"IPs to Ban","description":"Enter one IP address per-line. Optionally, include a note by ending the line with a # sign.","type":"array","items":{"type":"string","default":""},"minItems":1,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc\/ban-users\/add-many"}]}},"\/ithemes-security\/rpc\/global\/detect-ip":{"namespace":"ithemes-security\/rpc","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"proxy":{"type":"string","enum":["automatic","security-check","manual","disabled"],"required":true},"args":{"type":"object","default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc\/global\/detect-ip"}]}},"\/ithemes-security\/rpc\/notification-center\/notifications":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc\/notification-center\/notifications"}]}},"\/ithemes-security\/rpc\/notification-center\/available-users-roles":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc\/notification-center\/available-users-roles"}]}},"\/ithemes-security\/rpc\/file-writing\/get-config-rules":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc\/file-writing\/get-config-rules"}]}},"\/ithemes-security\/v1":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ithemes-security\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1"}]}},"\/ithemes-security\/v1\/bans":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"actor_type":{"title":"Actor Type","description":"The type of actor that created the ban.","type":"string","enum":["user","lockout_module"],"required":false},"actor_id":{"title":"Actor Identifier","description":"The particular actor that caused the ban.","type":"string","required":false},"created_after":{"title":"Banned After","description":"Limit to bans added after the given date.","type":"string","format":"date-time","required":false},"created_before":{"title":"Banned Before","description":"Limit to bans added before the given date.","type":"string","format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/bans"}]}},"\/ithemes-security\/v1\/bans\/(?Pdatabase)":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"actor_type":{"title":"Actor Type","description":"The type of actor that created the ban.","type":"string","enum":["user","lockout_module"],"required":false},"actor_id":{"title":"Actor Identifier","description":"The particular actor that caused the ban.","type":"string","required":false},"created_after":{"title":"Banned After","description":"Limit to bans added after the given date.","type":"string","format":"date-time","required":false},"created_before":{"title":"Banned Before","description":"Limit to bans added before the given date.","type":"string","format":"date-time","required":false}}},{"methods":["POST"],"args":{"host":{"title":"IP","description":"The IP address to ban.","type":"string","required":false},"created_by":{"title":"Created By","description":"The actor who added the ban.","type":"object","properties":{"type":{"type":"string","enum":["user","lockout_module"],"description":"The type of the actor."},"id":{"type":"string","description":"The identifier for the actor."}},"required":true},"comment":{"title":"Notes","description":"A comment describing the ban.","type":"string","maxLength":255,"required":false}}}]},"\/ithemes-security\/v1\/bans\/(?Pdatabase)\/(?P\\d+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false}}},{"methods":["PUT"],"args":{"id":{"type":"integer","required":false},"comment":{"title":"Notes","description":"A comment describing the ban.","type":"string","maxLength":255,"required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/modules":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"status":{"type":"string","enum":["active","inactive"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/modules"}]}},"\/ithemes-security\/v1\/modules\/(?P[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"allow_batch":{"v1":true},"args":{"status":{"title":"Module Status","type":"object","properties":{"selected":{"type":"string","enum":["active","inactive"],"context":["view","edit","embed"]},"default":{"type":"string","enum":["always-active","default-active","default-inactive"],"context":["edit"],"readonly":true}},"required":false},"tools":{"title":"Module Tools","type":"object","additionalProperties":{"type":"object"},"required":false}}}]},"\/ithemes-security\/v1\/settings":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"modules":{"oneOf":[{"type":"string","enum":[":all",":active"]},{"type":"array","items":{"type":"string"}}],"default":":all","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/settings"}]}},"\/ithemes-security\/v1\/settings\/(?P[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":[]},{"methods":["PUT"],"allow_batch":{"v1":true},"args":[]},{"methods":["PATCH"],"allow_batch":{"v1":true},"args":[]},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":[]}]},"\/ithemes-security\/v1\/site-types":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/site-types"}]}},"\/ithemes-security\/v1\/site-types\/(?P[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT"],"args":{"answers":{"description":"The list of answers.","type":"array","items":{"type":"object","properties":{"question":{"description":"The question id.","type":"string"},"answer":{"description":"The user provided answer.","type":["array","object","boolean","number","integer","string"]},"modules":{"type":"array","readonly":true,"items":{"type":"string"}},"settings":{"type":"object","readonly":true},"user_groups":{"type":"array","readonly":true,"items":{"type":"object"}},"user_groups_settings":{"type":"object","readonly":true,"additionalProperties":{"type":"object"}},"canonical_group_substitutions":{"type":"object","readonly":true,"additionalProperties":{"type":"string"}}}},"required":false}}}]},"\/ithemes-security\/v1\/tools":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/tools"}]}},"\/ithemes-security\/v1\/tools\/(?P[\\w\\-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PUT"],"args":{"enabled":{"type":"boolean","required":false}}},{"methods":["POST"],"args":[]}]},"\/ithemes-security\/v1\/user-actions":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"users":{"type":"array","items":{"type":"integer"},"required":false},"query":{"type":"object","properties":[],"required":false},"actions":{"type":"object","properties":{"force-logout":{"type":"boolean","enum":[true]},"reset-password":{"type":"boolean","enum":[true]},"add-user-groups":{"type":"array","items":{"type":"string","format":"uuid"}}},"additionalProperties":false,"minProperties":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/user-actions"}]}},"\/ithemes-security\/v1\/logs":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"before":{"type":"string","format":"date-time","required":false},"after":{"type":"string","format":"date-time","required":false},"module":{"type":"array","items":{"type":"string"},"required":false},"code":{"type":"array","items":{"type":"string"},"required":false},"type":{"type":"array","items":{"type":"string","enum":["critical-issue","action","fatal","error","warning","notice","debug","process-start","process-update","process-stop"],"enumNames":["Critical Issue","Action","Fatal Error","Error","Warning","Notice","Debug","Process","Process Update","Process Stop"]},"required":false},"user":{"type":"array","items":{"type":"integer"},"required":false},"ip":{"type":"array","items":{"type":"string","format":"ip"},"required":false},"order":{"type":"string","enum":["asc","desc"],"default":"desc","required":false},"orderby":{"type":"string","enum":["created_at","id","module","code","type","request_started_at","user","site"],"default":"created_at","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/logs"}]}},"\/ithemes-security\/v1\/logs\/(?P[\\d]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/geolocate\/(?P.+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ip":{"type":"string","format":"ip","required":false}}}]},"\/ithemes-security\/rpc\/lockout-stats\/top-blocked-ips":{"namespace":"ithemes-security\/rpc","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"default":"30-days","oneOf":[{"type":"object","additionalProperties":false,"properties":{"start":{"type":"string","format":"date-time","required":true},"end":{"type":"string","format":"date-time","required":true}}},{"type":"string","enum":["24-hours","week","30-days"]}],"required":false},"number":{"type":"integer","minimum":0,"maximum":10,"default":5,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc\/lockout-stats\/top-blocked-ips"}]}},"\/ithemes-security\/v1\/lockouts":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/lockouts"}]}},"\/ithemes-security\/v1\/lockouts\/(?P[\\d]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/lockouts\/(?P[\\d]+)\/release-lockout":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/lockouts\/(?P[\\d]+)\/ban-lockout":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/rpc\/discover":{"namespace":"ithemes-security\/rpc","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"url":{"type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/rpc\/discover"}]}},"\/contact-form-7\/v1":{"namespace":"contact-form-7\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"contact-form-7\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/contact-form-7\/v1"}]}},"\/contact-form-7\/v1\/contact-forms":{"namespace":"contact-form-7\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/contact-form-7\/v1\/contact-forms"}]}},"\/contact-form-7\/v1\/contact-forms\/(?P\\d+)":{"namespace":"contact-form-7\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/contact-form-7\/v1\/contact-forms\/(?P\\d+)\/feedback":{"namespace":"contact-form-7\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/contact-form-7\/v1\/contact-forms\/(?P\\d+)\/feedback\/schema":{"namespace":"contact-form-7\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/contact-form-7\/v1\/contact-forms\/(?P\\d+)\/refill":{"namespace":"contact-form-7\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/litespeed\/v1":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"litespeed\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1"}]}},"\/litespeed\/v1\/toggle_crawler_state":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/toggle_crawler_state"}]}},"\/litespeed\/v1\/tool\/check_ip":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/tool\/check_ip"}]}},"\/litespeed\/v1\/ip_validate":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/ip_validate"}]}},"\/litespeed\/v1\/token":{"namespace":"litespeed\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/token"}]}},"\/litespeed\/v1\/ping":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/ping"}]}},"\/litespeed\/v1\/apikey":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/apikey"}]}},"\/litespeed\/v1\/cdn_status":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/cdn_status"}]}},"\/litespeed\/v1\/notify_img":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/notify_img"}]}},"\/litespeed\/v1\/notify_ucss":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/notify_ucss"}]}},"\/litespeed\/v1\/notify_vpi":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/notify_vpi"}]}},"\/litespeed\/v1\/err_domains":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/err_domains"}]}},"\/litespeed\/v1\/check_img":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/litespeed\/v1\/check_img"}]}},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/introductions\/(?P[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P[\\w-]+)\/(?P[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/wincher\/authorization-url":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wincher\/authorization-url"}]}},"\/yoast\/v1\/wincher\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"websiteId":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wincher\/authenticate"}]}},"\/yoast\/v1\/wincher\/keyphrases\/track":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wincher\/keyphrases\/track"}]}},"\/yoast\/v1\/wincher\/keyphrases":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":false},"permalink":{"required":false},"startAt":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wincher\/keyphrases"}]}},"\/yoast\/v1\/wincher\/keyphrases\/untrack":{"namespace":"yoast\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wincher\/keyphrases\/untrack"}]}},"\/yoast\/v1\/wincher\/account\/limit":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wincher\/account\/limit"}]}},"\/yoast\/v1\/wincher\/account\/upgrade-campaign":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/wincher\/account\/upgrade-campaign"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/yoast\/v1\/workouts"}]}},"\/ithemes-security\/v1\/dashboard-available-cards":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/dashboard-available-cards"}]}},"\/ithemes-security\/v1\/dashboard-available-cards\/(?P[\\w_-]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/ithemes-security\/v1\/dashboard-static":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"default":"30-days","oneOf":[{"type":"object","additionalProperties":false,"properties":{"start":{"type":"string","format":"date-time","required":true},"end":{"type":"string","format":"date-time","required":true}}},{"type":"string","enum":["24-hours","week","30-days"]}],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/dashboard-static"}]}},"\/ithemes-security\/v1\/dashboard\/events":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"period":{"default":"30-days","oneOf":[{"type":"object","additionalProperties":false,"properties":{"start":{"type":"string","format":"date-time","required":true},"end":{"type":"string","format":"date-time","required":true}}},{"type":"string","enum":["24-hours","week","30-days"]}],"required":false},"events":{"type":"array","items":{"type":"string"},"uniqueItems":true,"minItems":1,"maxItems":10,"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/dashboard\/events"}]}},"\/ithemes-security\/v1\/admin-notices":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/admin-notices"}]}},"\/ithemes-security\/v1\/admin-notices\/(?P[\\w\\-\\.]+)\/(?P[\\w\\-]+)":{"namespace":"ithemes-security\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/ithemes-security\/v1\/admin-notices\/settings":{"namespace":"ithemes-security\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/admin-notices\/settings"}]}},"\/ithemes-security\/v1\/actors":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/actors"}]}},"\/ithemes-security\/v1\/actors\/(?P[\\w\\-\\_]+)\/search":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/ithemes-security\/v1\/firewall\/rules":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"provider":{"type":"array","items":{"type":"string"},"required":false},"vulnerability":{"type":"array","items":{"type":"string"},"required":false},"paused":{"type":"boolean","required":false}}},{"methods":["POST"],"args":{"name":{"type":"string","minLength":1,"required":true},"config":{"type":"object","properties":{"rules":{"type":"array","items":{"type":"object","properties":{"parameter":{"type":["string","array"],"required":true,"items":{"type":"string"}}}},"required":true,"minItems":1,"uniqueItems":true},"type":{"type":"string","enum":["BLOCK","LOG","REDIRECT","WHITELIST"],"required":true},"type_params":{"type":"string","format":"uri"}},"required":true},"paused_at":{"type":["string","null"],"format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/firewall\/rules"}]}},"\/ithemes-security\/v1\/firewall\/rules\/(?P[\\d]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"args":{"name":{"type":"string","minLength":1,"required":false},"config":{"type":"object","properties":{"rules":{"type":"array","items":{"type":"object","properties":{"parameter":{"type":["string","array"],"required":true,"items":{"type":"string"}}}},"required":true,"minItems":1,"uniqueItems":true},"type":{"type":"string","enum":["BLOCK","LOG","REDIRECT","WHITELIST"],"required":true},"type_params":{"type":"string","format":"uri"}},"required":false},"paused_at":{"type":["string","null"],"format":"date-time","required":false}}},{"methods":["DELETE"],"args":{"id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/user-groups":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"label":{"type":"string","minLength":1,"required":true},"users":{"type":"array","items":{"type":"integer","minimum":0},"uniqueItems":true,"required":false},"roles":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor"]},"required":false},"canonical":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber"]},"required":false},"min_role":{"type":"string","enum":["","administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor"],"required":false},"ignore_duplicate":{"type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/user-groups"}]}},"\/ithemes-security\/v1\/user-groups\/(?P[\\w_:-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"label":{"type":"string","minLength":1,"required":false},"users":{"type":"array","items":{"type":"integer","minimum":0},"uniqueItems":true,"required":false},"roles":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor"]},"required":false},"canonical":{"type":"array","items":{"type":"string","enum":["administrator","editor","author","contributor","subscriber"]},"required":false},"min_role":{"type":"string","enum":["","administrator","editor","author","contributor","subscriber","wpseo_manager","wpseo_editor"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/user-matchables":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/user-matchables"}]}},"\/ithemes-security\/v1\/user-matchable-settings":{"namespace":"ithemes-security\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"include":{"type":"array","items":{"type":"string"},"required":false}}},{"methods":["PATCH"],"args":{"global":{"title":"Global Settings","type":"object","properties":{"manage_group":{"title":"Manage Solid Security","description":"Allow users to manage Solid Security.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"dashboard":{"title":"Security Dashboard","type":"object","properties":{"group":{"title":"Enable Dashboard Creation","description":"Allow users to create new Solid Security Dashboards.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"password-requirements":{"title":"Password Requirements","type":"object","properties":{"requirement_settings.strength.group":{"title":"Strong Passwords","description":"Require strong passwords approved by the WordPress password strength meter.","type":"boolean","context":["view","edit","embed"]},"requirement_settings.hibp.group":{"title":"Refuse Compromised Passwords","description":"Reject passwords that have appeared in password breaches tracked by haveibeenpwned.com. This is a secure API call that does not transmit complete, unhashed passwords.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"include":{"type":"array","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/user-matchable-settings"}]}},"\/ithemes-security\/v1\/user-matchable-settings\/(?P.*)":{"namespace":"ithemes-security\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["PUT"],"allow_batch":{"v1":true},"args":{"id":{"type":"string","required":false},"global":{"title":"Global Settings","type":"object","properties":{"manage_group":{"title":"Manage Solid Security","description":"Allow users to manage Solid Security.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"dashboard":{"title":"Security Dashboard","type":"object","properties":{"group":{"title":"Enable Dashboard Creation","description":"Allow users to create new Solid Security Dashboards.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false},"password-requirements":{"title":"Password Requirements","type":"object","properties":{"requirement_settings.strength.group":{"title":"Strong Passwords","description":"Require strong passwords approved by the WordPress password strength meter.","type":"boolean","context":["view","edit","embed"]},"requirement_settings.hibp.group":{"title":"Refuse Compromised Passwords","description":"Reject passwords that have appeared in password breaches tracked by haveibeenpwned.com. This is a secure API call that does not transmit complete, unhashed passwords.","type":"boolean","context":["view","edit","embed"]}},"additionalProperties":false,"required":false}}}]},"\/ithemes-security\/v1\/strong-passwords\/scan":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/strong-passwords\/scan"}]}},"\/ithemes-security\/v1\/strong-passwords\/scan\/(?P[\\d]+)\/mute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/ithemes-security\/v1\/strong-passwords\/scan\/(?P[\\d]+)\/unmute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}]},"\/ithemes-security\/v1\/site-scanner\/scans":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"code":{"type":"array","items":{"type":"string"},"required":false},"before":{"type":"string","format":"date-time","required":false},"after":{"type":"string","format":"date-time","required":false}}},{"methods":["POST"],"args":{"site_id":{"type":"integer","default":0,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/site-scanner\/scans"}]}},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P\\d+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P\\d+)\/issues":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"entry":{"type":"array","items":{"type":"string","enum":["vulnerabilities","blacklist","malware"]},"required":false},"scan_id":{"type":"integer","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P\\d+)\/issues\/(?P[\\w_-]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"scan_id":{"type":"integer","required":false},"issue_id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/scans\/(?P\\d+)\/issues\/(?P[\\w_-]+)\/fix":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"scan_id":{"type":"integer","required":false},"issue_id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/muted-issues":{"namespace":"ithemes-security\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"id":{"type":"string","required":false},"muted_by":{"type":"integer","required":false},"muted_at":{"type":"string","format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/site-scanner\/muted-issues"}]}},"\/ithemes-security\/v1\/site-scanner\/muted-issues\/(?P[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["DELETE"],"args":[]}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"resolution":{"type":"array","items":{"type":"string","enum":["","unresolved","patched","muted","deactivated","deleted","updated","auto-updated"]},"required":false},"software_type":{"type":"array","items":{"type":"string","enum":["plugin","theme","wordpress"]},"required":false},"patchable":{"type":"boolean","required":false},"first_seen_after":{"type":"string","format":"date-time","required":false},"first_seen_before":{"type":"string","format":"date-time","required":false},"last_seen_after":{"type":"string","format":"date-time","required":false},"last_seen_before":{"type":"string","format":"date-time","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/site-scanner\/vulnerabilities"}]}},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P[\\w-]+)":{"namespace":"ithemes-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","edit"],"default":"view","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P[\\w-]+)\/mute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P[\\w-]+)\/unmute":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P[\\w-]+)\/fix":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/vulnerabilities\/(?P[\\w-]+)\/deactivate-software":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"string","required":false}}}]},"\/ithemes-security\/v1\/site-scanner\/verify-scan":{"namespace":"ithemes-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"secret":{"type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/ithemes-security\/v1\/site-scanner\/verify-scan"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"footnotes":{"type":"string","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"footnotes":{"type":"string","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P[\\d]+)\/revisions\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/posts\/(?P[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"footnotes":{"type":"string","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/posts\/(?P[\\d]+)\/autosaves\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"footnotes":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"footnotes":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P[\\d]+)\/revisions\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/pages\/(?P[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"footnotes":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/pages\/(?P[\\d]+)\/autosaves\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type.","type":"string","enum":["image","video","text","application","audio"],"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type.","type":"string","required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""}},"required":false}}}]},"\/wp\/v2\/menu-items\/(?P[\\d]+)\/autosaves\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"wp_pattern_sync_status":{"type":"string","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"wp_pattern_sync_status":{"type":"string","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P[\\d]+)\/revisions\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/blocks\/(?P[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","description":"","default":false},"_stopmodifiedupdate":{"type":"boolean","description":"","default":false},"_modified_date":{"type":"string","description":"","default":""},"wp_pattern_sync_status":{"type":"string","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P[\\d]+)\/autosaves\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/templates\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P[\\d]+)\/revisions\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/navigation\/(?P[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P[\\d]+)\/autosaves\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":2,"minimum":2,"maximum":2,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":2,"minimum":2,"maximum":2,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":2,"minimum":2,"maximum":2,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P[\\d]+)\/font-faces\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face"}},"required":false},"solid_user_groups":{"type":"array","items":{"type":"string","format":"uuid"},"required":false},"solid_last_seen":{"type":"object","properties":{"after":{"type":"string","format":"date-time"},"before":{"type":"string","format":"date-time"}},"required":false},"solid_password_changed":{"type":"object","properties":{"after":{"type":"string","format":"date-time"},"before":{"type":"string","format":"date-time"}},"required":false},"solid_password_strength":{"type":"array","items":{"type":"integer","enum":[0,1,2,3,4],"enumNames":["Very Weak","Weak","Medium","Strong"]},"required":false}}},{"methods":["POST"],"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"_itsec_primary_dashboard":{"type":"integer","description":"","default":0,"context":["edit"]}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"_itsec_primary_dashboard":{"type":"integer","description":"","default":0,"context":["edit"]}},"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"_itsec_primary_dashboard":{"type":"integer","description":"","default":0,"context":["edit"]}},"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","format":"uuid","required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P(?:[\\d]+|me))\/application-passwords\/(?P[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","format":"uuid","required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","category","post_tag","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P[a-zA-Z0-9_-]+)\/(?P[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/(?P[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P[\\d]+)\/revisions\/(?P[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"description":"Site title.","type":"string","required":false},"description":{"description":"Site tagline.","type":"string","required":false},"url":{"description":"Site URL.","type":"string","format":"uri","required":false},"email":{"description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"description":"A date format for all date strings.","type":"string","required":false},"time_format":{"description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"description":"Default post category.","type":"integer","required":false},"default_post_format":{"description":"Default post format.","type":"string","required":false},"posts_per_page":{"description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"description":"What to show on the front page","type":"string","required":false},"page_on_front":{"description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"description":"Site logo.","type":"integer","required":false},"site_icon":{"description":"Site icon.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.sysgenpro.com\/blog\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]}},"site_logo":0,"site_icon":0,"site_icon_url":"","multisite":false,"_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}]}}