banner-oil-gas-mining-software-solutions
banner-oil-gas-mining-software-solutions-mob

Oil and Gas industry holds a strategic importance in any economy and stands as one of the biggest markets of the world. We, at sysgenpro, emphasize on the critical technology challenges encountered by the organizations and provide the cutting-edge solutions to address their strategic demands. We aim to simplify processes for our customers in modernizing their legacy software applications with our innovative oil and gas software solutions and services.

Our Expertise

Our softwares for Oil & Gas and Mining industry enables the organizations to overcome the key industry challenges of process complexity, safety and regulatory compliances. We add great value to our clients in planning and forecasting with more integrated processes for downstream as well as management level operations. Leveraging our web and mobile technologies, oil and gas companies can enhance their business landscapes and integrate new IT systems. Our custom-built oil and gas software applications span over multiple technologies including cloud as well as mobile. Major mining companies have benefited with increased efficiency by utilizing our mining software services for automation and managing dynamic workforce.

Well Dynamics

A robust custom application for the Oil and Gas industry to analyze a specific well and calculate various parameters based on input data. The monitoring and modelling software facilitates the user to manage various risk factors at every foot of an oil well and enables the deeper insights to allow the user to make an informed decision.

  • Raw Data Processing
  • Integrated Wellbore Modelling
  • High visual Outputs
  • Powerful algorithms
  • Easy Calibration
  • Monitor well performance
  • Powerful 2D and 3D Charting
  • Fast Data Loading
  • Leak Detection
  • Gas Lift Optimization
  • Accurate quantitative analysis
  • Nodal Analysis
oil-gas-gray-bg

Gravel Pack Solution

Professional software application to simulate, evaluate, optimize and design gravel packs under complex scenarios by integrating advanced modelling and data analysis techniques. The Gravel Pack Solution evaluates a large set of data for performance optimization and accomplishes a wide range of objectives with the use of latest technology. Used by the major operators and service companies for in-house simulation and evaluation of sand control completions, it facilitates both online and offline support.

Simulate

Model and predict the outcome of treatment prior to execution.

  • Well analysis
  • Manage fluid and gravel information
  • Real time progress of simulation
  • Compare multiple scenarios

Evaluate

Analyse the measurements to define the success of treatment

  • Data Management
  • Range Management
  • In-depth investigation of failures
  • Advanced analysis techniques

Optimize

Compare the predictions and results for continuous improvement

  • Advanced and intuitive
  • Accurate design optimization
  • Easy to use interface
  • Large DataSet Optimization

GPS Fleet Tracking System

Oil & Gas industry requires a very high number of vehicles in their fleet for transportation which is regulated for health and safety purposes. GPS fleet tracking software system helps in managing and optimizing fleet usage, reducing fuel cost, scheduling maintenance, route optimization & time saving, driver overtime, driving quality improvements, accountability and meets health and safety compliances.

  • Integration with various types of devices and protocols and processing variable data
  • Complex alert engine with user defined rules like driving without seat belt
  • Socket base TCP/UDP communication to receive data from devices
  • Reminder for all maintenance tasks like oil change, tyre change, registration renewal etc.
  • Tracking of thousands of vehicles and real time plotting on maps
  • Fuel report based on fuel sensors and driver scorecard report based on driving types and violations
  • Integration of google maps, Bing maps and Open layer maps to plot live and historical locations
  • Custom mapping solution for variable data integration
  • Custom rules and geofences to keep track of any violation
  • Saas architecture for different types of customers as well as resellers
Media right
assest-optimization-bg

Asset Optimization & Production Analysis

Mining companies can streamline and monitor their operational procedures enabling them to lower the total cost of ownership with improved business performance. To gain better control over the resources for the gold mines, the asset reporting web application helps to manage information effectively and makes it readily available for better decision making. The real time display of information results in improved asset reporting.

  • Capturing live information from Fleetmatic for fleet management
  • Actual load against planned load transferred by different fleets
  • Actual gold produced against gold mined and planned production
  • Analysis of material, machines and equipment for production & utilization
  • Equipments, operators, trucks, excavators and fleet management
  • Different performance analysis based on shifts, equipment and operators

Equipment monitoring & management

Equipment monitoring system is an easy way to interpret and analyse the mining data obtained from different kinds of equipment in order to monitor the working condition of various equipment pieces. By identifying possibility of any breakdown at an earlier stage, precautionary measures can be taken and impact can be minimized. The software system saves time and efforts by automating difficult calculations from the equipment data and displays result in easy to understand form.

  • Data analysis from Haul Trucks, Dozers, Excavators, Shovels and others
  • Overall status of equipment as well as component level drill down
  • Integration with long wall monitoring and alert notifications
  • Raw data aggregation and algorithm based analysis for health check
  • Fault measurement and recommended actions to resolve faults
  • Trends analysis in equipment, integration with Proficy Historian

Oil & Gas Mining Case Studies

We have digitized various processes of oil & gas and mining companies to provide them significant financial benefits. Have a look at our work.

gravel-pack-solution-casestudy
gravel-pack-solution-casestudy-mob

Gravel Pack Solution

Developed Gravel pack software application for oil companies to design, simulate, evaluate, and optimize their gravel packs during uncertainties or untimely events. sysgenpro developed a fully-integrated model that supports online and offline integration and access of large data sets for oils and rigs with 2D/3D simulation diagrams, calibrate features, and documentation assistance.

view case study
equipment-monitoring-system-casestudy
equipment-monitoring-system-casestudy-mob

Mining Equipment System

sysgenpro integrated an advanced equipment monitoring system for a mining company based out of South Africa who wanted to minimize the risk of equipment breakdowns. Explore how we developed a multi-facilitating solution for our client to perform efficient analysis, integrate mining details and monitor equipment functionalities all at once through web application.

view case study
well-dynamics-casestudy
well-dynamics-casestudy-mob

Reservoir Monitoring and Modelling Software

As a leading oil & gas software development company, sysgenpro developed an application for one of the oil companies based out in the UK to measure gas flow, temperature, pressure, viscosity, etc at every foot of an oil well. sysgenpro created a smart mathamatical software application that evaluates depths of a particular oil well and creates different models including multiphase inflow modelling and tubing modelling.

view case study

Global Presence

As a full-fledged IT service provider, sysgenpro has marked its global presence with offices in five countries, including US, UK, Canada, Australia and India, with a skilled team specializing in different technologies.

We are tapping into the power of digital world, creating high impact solutions to boost the business efficiency. sysgenpro as a Software Development Company is committed to provide End-to End Customized Solutions to our global customers and tackle the technology problems faced by businesses.

global-presence-map-3