Parallel Run Strategies: Testing New ERP Systems Alongside Legacy Systems

Learn how to execute parallel run strategies for ERP migrations. This guide covers planning, data synchronization, reconciliation, and risk mitigation to ensure a smooth transition from legacy to new systems.

8 min readSysGenPro Editorial
Parallel Run Strategies: Testing New ERP Systems Alongside Legacy Systems

What Are Parallel Run Strategies for ERP Migrations?

Parallel run strategies involve operating the new ERP system alongside the legacy system for a defined period to validate functionality, data integrity, and business process accuracy before fully decommissioning the old platform. This approach is critical for high-risk migrations where data loss or operational disruption could have severe financial or regulatory consequences. The primary goal is to prove that the new system can handle real-world workloads and produce accurate results without relying on the legacy system for daily operations. Key risks to control during this phase include data synchronization errors, reporting discrepancies, performance bottlenecks, and user confusion due to dual-entry requirements. By identifying these issues in a controlled environment, organizations can mitigate risks before the final cutover, ensuring a smoother transition and protecting business continuity.

Planning the Parallel Run Environment

Successful parallel runs require a meticulously planned environment that mirrors production conditions. The new ERP system must be deployed in a staging or production-like environment with identical hardware specifications, network configurations, and security protocols as the target production setup. Data from the legacy system must be migrated to the new system using validated migration scripts. It is essential to establish a clear data synchronization strategy. Depending on the complexity, this may involve real-time synchronization via APIs or batch processing at specific intervals. The choice between real-time and batch sync depends on the tolerance for data latency and the volume of transactions. Additionally, the environment must be isolated from production to prevent accidental data corruption or interference with live operations.

Defining Scope and Duration

The scope of the parallel run should cover all critical business processes, including finance, supply chain, human resources, and customer relationship management. The duration is typically determined by the complexity of the business and the volume of transactions. A minimum of one full business cycle, such as a monthly or quarterly close, is recommended to validate end-to-end processes. For organizations with complex seasonal variations, multiple cycles may be necessary. The project team must define clear entry and exit criteria. Entry criteria include successful data migration and system stability, while exit criteria involve meeting predefined accuracy thresholds and resolving critical defects.

Data Synchronization and Integrity

Data integrity is the cornerstone of a successful parallel run. Discrepancies between the legacy and new systems can erode trust in the new platform and lead to incorrect decision-making. Organizations must implement robust data reconciliation processes. This involves comparing key data points, such as account balances, inventory levels, and customer records, between the two systems. Automated reconciliation tools can significantly reduce the time and effort required for manual checks. These tools should flag discrepancies for investigation and provide detailed reports on the root causes. Common issues include mapping errors, transformation logic flaws, and data cleansing gaps. Addressing these issues promptly is crucial to maintaining data accuracy.

Data CategoryReconciliation FrequencyTolerance ThresholdOwner
Financial AccountsDaily0.00Finance Controller
Inventory LevelsWeekly1%Supply Chain Manager
Customer RecordsMonthly0.5%CRM Lead
Employee DataMonthly0.00HR Director

Business Process Validation

Beyond data integrity, the parallel run must validate that business processes function correctly in the new system. This involves executing real transactions in both systems and comparing the outcomes. For example, a sales order entered in the legacy system should result in the same inventory deduction and revenue recognition in the new system. User acceptance testing (UAT) is a critical component of this phase. End-users must be involved in testing to ensure that the new system meets their operational needs and that workflows are intuitive. Feedback from UAT should be documented and addressed before the final cutover. This phase also helps identify gaps in training and documentation, allowing the project team to refine user guides and support materials.

Performance and Load Testing

Performance testing during the parallel run ensures that the new ERP system can handle peak loads without degradation. This is particularly important for organizations with high transaction volumes or complex reporting requirements. Load testing should simulate realistic user scenarios, including concurrent users, batch jobs, and integration calls. Performance metrics such as response times, throughput, and resource utilization should be monitored and compared against baseline expectations. If performance issues are identified, they must be resolved before the cutover. This may involve optimizing database queries, tuning application settings, or scaling infrastructure. Performance regressions can lead to user frustration and operational delays, making this a critical validation step.

Managing User Adoption and Training

User adoption is a significant challenge during parallel runs. Employees may be reluctant to use the new system due to familiarity with the legacy platform or concerns about job security. To mitigate this, organizations must invest in comprehensive training programs. Training should be role-based and tailored to the specific needs of different user groups. Hands-on workshops and sandbox environments allow users to practice in a risk-free setting. Communication is also crucial. Regular updates on the progress of the parallel run, the benefits of the new system, and the timeline for cutover help build confidence and reduce resistance. Support channels, such as help desks and peer support groups, should be established to address user queries and issues promptly.

Risk Mitigation and Rollback Planning

Despite thorough planning, risks remain during parallel runs. A robust risk mitigation strategy is essential to address potential issues. This includes identifying key risks, such as data loss, system downtime, and integration failures, and developing contingency plans for each. A rollback plan is a critical component of this strategy. It outlines the steps to revert to the legacy system if the new system fails to meet critical criteria. The rollback plan should be tested to ensure its feasibility. Decision criteria for triggering a rollback must be clearly defined and agreed upon by all stakeholders. These criteria may include unresolved critical defects, significant data discrepancies, or performance failures. Having a well-defined rollback plan provides a safety net and reduces the pressure on the project team during the cutover.

Monitoring and Reporting

Continuous monitoring is essential to track the health of the parallel run. Key performance indicators (KPIs) should be defined and monitored regularly. These KPIs may include data reconciliation accuracy, system uptime, user adoption rates, and defect resolution times. Dashboards and reports should be generated to provide visibility into the progress of the parallel run. These reports should be shared with stakeholders to ensure transparency and alignment. Issues identified during monitoring should be logged in a defect tracking system and prioritized based on their impact on the business. Regular review meetings should be held to discuss the status of the parallel run, address open issues, and make decisions on next steps.

Transitioning to Cutover

The transition from parallel run to cutover is a critical milestone. The decision to cut over should be based on the achievement of predefined exit criteria. These criteria should include successful completion of all business process validations, resolution of critical defects, and meeting data accuracy thresholds. A go/no-go meeting should be held with key stakeholders to review the status of the parallel run and make the final decision. If the decision is to proceed with cutover, a detailed cutover plan should be executed. This plan should include steps for final data migration, system configuration, user communication, and post-go-live support. The cutover should be performed during a planned downtime window to minimize disruption to business operations.

Post-Go-Live Stabilization

The parallel run does not end with the cutover. Post-go-live stabilization is essential to ensure that the new system operates smoothly in the production environment. This phase involves monitoring the system for any issues that may have been missed during the parallel run. Support teams should be on standby to address user queries and resolve defects. Regular reviews should be conducted to assess the performance of the new system and identify areas for improvement. Feedback from users should be collected and used to refine processes and configurations. The legacy system should be decommissioned only after a period of stable operation in the new system. This ensures that the organization has sufficient confidence in the new platform before fully retiring the legacy system.

Conclusion

Parallel run strategies are a vital component of successful ERP migrations. By operating the new system alongside the legacy platform, organizations can validate data integrity, business processes, and performance before committing to a full cutover. This approach mitigates risks, ensures business continuity, and builds user confidence. Key elements of a successful parallel run include a well-planned environment, robust data reconciliation, comprehensive user training, and a clear rollback plan. By following these best practices, organizations can navigate the complexities of ERP migration and achieve a smooth transition to their new system.

Written by
SysGenPro Editorial

SysGenPro Editorial

Platform & solutions team

Practical guidance on ERP, AI automation, cloud deployment and enterprise transformation from the SysGenPro team.

Share this article

Frequently asked questions

Common questions on this topic. Talk to our team for anything specific to your business.

01How long should an ERP parallel run last?

The duration depends on business complexity, but at least one full business cycle (e.g., monthly close) is recommended to validate end-to-end processes.

02What is the main risk of running two ERP systems at once?

The primary risk is data inconsistency between systems, which can lead to incorrect reporting and decision-making if not properly reconciled.

03How do you reconcile data between legacy and new ERP systems?

Use automated reconciliation tools to compare key data points like account balances and inventory levels, flagging discrepancies for investigation.

04Can parallel runs be automated for data comparison?

Yes, automated tools can significantly reduce manual effort by continuously comparing data and generating discrepancy reports.

05What are the cost implications of a parallel run strategy?

Costs include additional infrastructure, licensing, and labor for dual operations, but these are offset by reduced cutover risks and potential downtime.

06When should you stop the parallel run and cut over?

Cut over when predefined exit criteria are met, including data accuracy thresholds, resolution of critical defects, and successful user acceptance testing.

Continue learning
View all articles
Explore the platform

Where to go next

Browse the knowledge hub

See how SysGenPro fits your business

Discuss your workflows, modules and deployment options with our team.

Back to resources